Committee activities
In addition to our main activity, the electrotechnical certification of power generators based on renewable energies, we are involved in the standardization of know-how within the framework of extensive guideline activities. This ensures that the energy transition is implemented in a high-quality and sustainable manner in Germany, Europe and worldwide.
M.O.E. and its employees are currently active in the following committees:
Since 2022 |
|
Since 2020 |
|
Since 2019 |
|
Since 2018 |
|
Since 2017 |
|
Since 2016 |
|
Since 2015 |
|
Since 2014 |
|
Since 2013 |
|
Since 2012 |
|
Since 2011 |
|
Since 2010 |
|
Since 2009 |
|
Since 2008 |
|
Since 1994 |
|
M.O.E. and its employees were active in the following bodies
- Chairman of AK Verbrennungskraftmaschinen Netzintegration FGW e.V. (2012-2016)
- Steering Committee FGH Certification Body for Decentralized Generation Plants (2005-2009)
- IEC 61000-4-15 Part 4: Testing and measurement techniques – Section 15: Flickermeter – Functional and design specifications (2005-2008)
- IEC 61400-21 2ed. Power Quality Measurement and Assessment of Power Quality Characterstics of Grid Connected Wind Turbines (2004-2010)
- FGW e.V. Technical Guideline Part 6: 60% – Reference yield – Verification based on the determination of wind potential and energy yields (2003-2004)
- Chairman “FGW e.V. Technical Guideline Part 4: Determination of Electrical Characteristics” – Power Plant Behavior – Future Guideline for Modeling, Validation, Simulation of Generation Plants (2002-2008)
- MEASENT Power Quality Measurement Procedure Version 3. November 2006 (2001-2009)
- MEASENT Power Performance Measurement Procedure Version November 4, 2006 (2001-2006)
- IEC 61400-12-1 Ed. 1 Measurement and assessment of power quality characteristics of grid connected wind turbines (2001-2005)
- IEC 61400-12-2 “IEC 61400-12-2 Ed. 1: Wind turbines – Part 12-2: Power performance of electricity producing wind turbines based on nacelle anemometry” (2001-2005)
- IEC 61400-12-3 “IEC 61400-12-3 Ed. 1: Wind turbines – Part 12-3: Wind farm power performance testing” (2001-2005)
- FGW Technical Guideline Part 5: Determination and application of the reference yield of wind turbines according to the Renewable Energies Act (2001-2005)
- Chairman “Technical Guideline Part 3: Determination of the Electrical Characteristics” of generating units on the medium, high and extra-high voltage grid (1994-2009)
Awarded and certified
Accredited as a certification body according to DIN EN ISO/IEC 17065, inspection body according to DIN EN ISO/IEC 17020 and as a testing laboratory according to DIN EN ISO/IEC 17025 by the German Accreditation Body (DAkkS). Formerly recommended by the Bundesverband der Energie- und Wasserwirtschaft e.V. (BDEW) and currently by FGW e.V. – Fördergesellschaft Windenergie und andere Erneuerbare Energien.