Protection tests

Protection tests by M.O.E. ensure a safe grid connection for your generation units or generation system. Only a proper protection test guarantees the safety of your system on the grid and thus permanent remuneration by the grid operator. They are therefore also a mandatory part of the EZA declaration of conformity as part of the certification process. The tests must be repeated every four years in order to ensure adequate protection for the system on the one hand and not to lose any claims against banks, insurance companies, etc. on the other. The results must be presented to the grid operator on request. We offer protection tests for generation units (wind turbines, PV inverters, CHP/VKM), LV protection relays (grid and system protection) and for the grid connection point (usually the transfer station).

Our advantages at a glance

  • State-of-the-art protection testing technology
  • Experience in the field of protection testing for various protection relays

  • Knowledge of specific generation units (WTG, PV, VKM)
  • Short system downtimes thanks to optimized test sequences

  • Clear documentation

  • Protection test according to certification requirements

  • Periodic protection tests

Henning Hinrichs, Abteilungsleiter Inspektion Elektrik – Ihr Ansprechpartner

Bitte kontaktieren Sie mich in allen Fragen zu den Themen:

  • Schutzprüfungen

  • DGUV Vorschrift 3

Rufen Sie mich gerne an unter
+49 (0) 4821 6453 – 262

Wind energy

Photovoltaics

Combustion engines / CHP

Hydropower

Storage systems

Components

E-mobility

Fuel cells

Awarded and certified

Accredited as a certification body according to DIN EN ISO/IEC 17065, inspection body according to DIN EN ISO/IEC 17020 and as a testing laboratory according to DIN EN ISO/IEC 17025 by the German Accreditation Body (DAkkS). Formerly recommended by the Bundesverband der Energie- und Wasserwirtschaft e.V. (BDEW) and currently by FGW e.V. – Fördergesellschaft Windenergie und andere Erneuerbare Energien.